Delivery day.

Unpacking

Inventory

The pile of packing paper.

Starting on the main spars

Installing the tank nutplates

Nutplates riveted in

Inspection plate nutplates countersunk

Tank nutplates countersunk

Starting on the wing tiedowns

Parts drilled

Primed and ready for assembly

Installed on main spar

Starting on rear spar

Fitting doubler plates

Parts ready for priming

Parts ready for riveting

Rear spars done

Those are alot of ribs.

Fluting after deburring

Better wear a glove when fluting all of the ribs in a two day period.

All done!!

Marking the position for the conduit holes.

Pitot and static line holes drilled in left wing ribs.

Match drilling conduit holes in all ribs.

Drillng conduit holes to 3/4".

Ribs in and drilled.

Ready to take apart debur, prime, and rivet together.

Ribs ready for priming

Ribs primed

Ready to rivet to spars

Riveting ribs to main spar

Hanging the wing on the jig and preparing for the skins

Drilling wing walk doubler

Doubler cut to size and drilled

Top inboard skin hanging

Top outboard skin hanging

my little helper

Fuel tank Z brackets

Fuel tank rear baffel

Tank ribs