|
|
|
Delivery day.
|
|
|
|
|
|
|
|
|
|
|
|
Unpacking
|
|
|
|
Inventory
|
|
|
|
|
The pile of packing paper.
|
|
|
|
|
Starting on the main spars
|
|
|
|
|
|
|
|
Installing the tank nutplates
|
|
|
|
|
Nutplates riveted in
|
|
|
|
|
|
Inspection plate nutplates countersunk
|
|
|
|
|
Tank nutplates countersunk
|
|
|
|
|
Starting on the wing tiedowns
|
|
|
|
|
Parts drilled
|
|
|
|
Primed and ready for assembly
|
|
|
|
|
Installed on main spar
|
|
|
|
|
|
Starting on rear spar
|
|
|
|
Fitting doubler plates
|
|
|
|
|
|
|
|
Parts ready for priming
|
|
|
|
|
Parts ready for riveting
|
|
|
|
Rear spars done
|
|
|
|
|
|
Those are alot of ribs.
|
|
|
|
Fluting after deburring
|
|
|
|
|
Better wear a glove when fluting all of the ribs in a two day period.
|
|
|
|
All done!!
|
|
|
|
|
Marking the position for the conduit holes.
|
|
|
|
Pitot and static line holes drilled in left wing ribs.
|
|
|
|
Match drilling conduit holes in all ribs.
|
|
|
|
Drillng conduit holes to 3/4".
|
|
|
|
Ribs in and drilled.
|
|
|
|
|
|
Ready to take apart debur, prime, and rivet together.
|
|
|
|
Ribs ready for priming
|
|
|
|
Ribs primed
|
|
|
|
Ready to rivet to spars
|
|
|
|
|
Riveting ribs to main spar
|
|
|
|
|
Hanging the wing on the jig and preparing for the skins
|
|
|
|
Drilling wing walk doubler
|
|
|
|
Doubler cut to size and drilled
|
|
|
|
|
Top inboard skin hanging
|
|
|
|
|
Top outboard skin hanging
|
|
|
|
|
my little helper
|
|
|
|
|
|
|
|
|
|
|
|
|
Fuel tank Z brackets
|
|
|
|
|
|
|
|
|
|
|
|
|
Fuel tank rear baffel
|
|
|
|
|
|
|
|
|
Tank ribs
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|