home projects

 

jill's kitchen buffet

All the materials laid out and ready to be shaped

Top piece cut

Rear piece is actually 3 strips glued together.

Fitting floor.

Fitting sides and center section.

Structural strip in place.

More preliminary fitting.

Fitting center drawer sides.

Finishing center box.

Floor perminantly attached.

Bottom strip added.

Side drawer strips added.

Time to break it down, move to the garage and glue together.

All pieced glued together and ready to paint the interior.

The Top is fitted.

The Dowel holes for the top are drilled.

The top is glued down for good.

Top edges are mitered

Getting ready to add trim.

Upper trim is added below top.

Lower trim being added.

First primer coat being added.

Primer are added and after some light sanding the final paint will be applied.

The red undercoat is sprayed on.

After this coat dries it will be sanded smooth and the satin black top coat will be sprayed.

The first coat of satin black paint has been applied. After wet sanding a second coat will be applied.

The sun put a few bubbles in the paint which were taken down with the wet sander.

Detail of red paint underneath.

The project is moved into the house.

Time to make the wine rack and the drawers.

First two pieces installed for the wine rack.

Top angle installed.

Bottom angle installed.

Last two pieces are installed and ready for paint.