|
|
|
All the materials laid out and ready to be shaped
|
|
|
|
Top piece cut
|
|
|
|
Rear piece is actually 3 strips glued together.
|
|
|
|
Fitting floor.
|
|
|
|
Fitting sides and center section.
|
|
|
|
|
Structural strip in place.
|
|
|
|
More preliminary fitting.
|
|
|
|
Fitting center drawer sides.
|
|
|
|
Finishing center box.
|
|
|
|
Floor perminantly attached.
|
|
|
|
|
|
Bottom strip added.
|
|
|
|
Side drawer strips added.
|
|
|
|
Time to break it down, move to the garage and glue together.
|
|
|
|
All pieced glued together and ready to paint the interior.
|
|
|
|
|
The Top is fitted.
|
|
|
|
The Dowel holes for the top are drilled.
|
|
|
|
The top is glued down for good.
|
|
|
|
Top edges are mitered
|
|
|
|
Getting ready to add trim.
|
|
|
|
|
Upper trim is added below top.
|
|
|
|
Lower trim being added.
|
|
|
|
First primer coat being added.
|
|
|
|
Primer are added and after some light sanding the final paint will be applied.
|
|
|
|
The red undercoat is sprayed on.
|
|
|
|
|
After this coat dries it will be sanded smooth and the satin black top coat will be sprayed.
|
|
|
|
|
|
The first coat of satin black paint has been applied. After wet sanding a second coat will be applied.
|
|
|
|
The sun put a few bubbles in the paint which were taken down with the wet sander.
|
|
|
|
|
Detail of red paint underneath.
|
|
|
|
The project is moved into the house.
|
|
|
|
Time to make the wine rack and the drawers.
|
|
|
|
First two pieces installed for the wine rack.
|
|
|
|
Top angle installed.
|
|
|
|
|
Bottom angle installed.
|
|
|
|
Last two pieces are installed and ready for paint.
|
|
|